Publications

Search publications and choose filters to show only the results you want

Filter search results

5063 publications

Disposal of approx. 55,235m3 of material (77,329 tonnes) from the impounded River Lagan. Material to be disposed at Belfast Dredging’s Site C. This includes This includes all material built up above -1.2m AOD with 2m wide side slopes (1:5 slope).

Published 07 April 2020Guidance literature

Installation of ropes and associated equipment and navigational markers, to allow seeding and harvesting of Laminaria Digitata, Alaria or Latissima Saccharina species.  Ropes will be set in parallel lines with anchors to keep the end of each line in place.

Published 07 April 2020Guidance literature

In the first three to four weeks, the tests will be conducted during day-light in order to refine and calibrate the marine mammal detection system. When the sonar system is fully calibrated, it is intended that tests will continue during hours of darkness.

Published 07 April 2020Guidance literature

Overall project includes the provisions of a new boat lock and mooring pontoons, a new footpath and footbridge linking Stranmillis and Annadale Embankments with associated landscaping work. Project also includes the refurbishment of the existing lagan weir.

Published 07 April 2020Guidance literature

Repair works to existing sea defences through the provision of well graded core material and secondary and primary layers of rock armour stone. The surface of the island is to be covered in weed barrier and approximately 150mm of clean stone.

Published 07 April 2020Guidance literature

Widening of Existing Slipway to Improve  Health and Safety

Published 07 April 2020Guidance literature

The transfer of CO2 gasses from a ship to holding tanks.

Published 07 April 2020Guidance literature

Construction of a new long sea outfall off the coast at Ballyferris to discharge treated wastewater to the Irish Sea.

Published 07 April 2020Guidance literature

Structural repairs required to the steel framework of the fishing platform on Eisenhower Pier at Bangor Marina. The works are required to improve the safety and increase the longevity of the existing structure.

Published 07 April 2020Guidance literature

Installation of a new LSO protective structure to consist of a precast reinforced concrete base slab with a prefabricated steel which will be fitted to the slab. The new Tidelfex valve will be fitted to the outlet of the existing LSO diffuser pipe.

Published 07 April 2020Guidance literature

Construction of storm water outfall to serve proposed formal storm drainage system. Installation of precast concrete outfall in existing stone revetment.

Published 07 April 2020Guidance literature

A temporary jetty will be installed on the shoreline. The jetty will be prefabbed and brought to the site in 4 sections and placed onto the site.

Published 07 April 2020Guidance literature

It is proposed to remove an abandoned motorboat which is located in Dundrum Bay, Co. Down. It is anticipated that the works can be completed within one week.

The boat will be transported from the site to a waste facility licensed to receive such waste.

Published 07 April 2020Guidance literature

Rock placement installation for the purposes of cable protection is planned on a section of the route where a repair omega joint on one of the two cables has been carried out in May 2019 around KP 148 in Northern Ireland Waters. Water depth is approximately 160m.

Published 07 April 2020Guidance literature

A headwall replacement at Drumeeny Lan, Bready. Works include the removing of the existing outfall and construction of a new in-situ concrete headwall with access steps.

Published 07 April 2020Guidance literature

Northern Ireland Railways (NIR) requires essential infrastructural maintenance on the Belfast to Larne line at the Inver River. The proposed works involve reinstatement of rock armour scour prevention measures which have recently deteriorated.

Published 07 April 2020Guidance literature

The Northern Ireland woodland register provides data in tabular format on the area of forest or woodland, by forest or woodland type, and whether managed by the Forest Service or not.

Published 07 April 2020Lists and registers

To deploy a submersible, gravity based, foundation platform for a tidal turbine which can quickly and easily deployed.

Published 06 April 2020Guidance literature

Proposed works include the demolition of the current VT2 Linkspan to be replaced with a new tier 2 Linkspan with associated support structure and on-shore approach ramp.

Published 06 April 2020Guidance literature

Works consist of the disposal of dredged material from Kilkeel Harbour at designated DAERA disposal site “Kilkeel”.

Published 06 April 2020Guidance literature

Back to top